OUR PROJECTS

November 2019

NEA SEDEGEM ASTROMERITIS, RELACEPMENT OF BURNERS OF TWO EXISTING STEAM BOILERS.

Replaced existing burners with new RIELLO burners in a beverage production factory.  Model used was  Riello press 450 for heavy oil. Higher efficiency and capacity and reduction of problems, maintenance and down time.

December 2021

HELLENIC MINERAL MINING SKOURIOTISSA: ( HOT WATER BOILER INSTALLATION )

One of the biggest projects of our company. This project was for Hellenic Mineral Mining in Skouriotissa.

 Project included two hot water Boiler IVAR of 6000 kW and two Riello modulating heavy oil burners N800 of 8000 kW capacity.  We provided a complete package of consulting , designing , supplying , installing and commissioning to our customer. Piping installation electrical works and everything  followed step by step to provide the best outcome for our customer. 

July 2022

HELLENIC MINERAL MINING SKOURIOTISSA: ( STEAM BOILER INSTALLATION )

Another project for Hellenic Mineral Mining Skouriotissa. We provided a complete package of consulting , designing , supplying , installing and commissioning to our customer. Followed step by step every request to provide the best outcome for our customer. 

A complete steam plant room including two Steam boiler PROODOS 500kg steam capacity each with RIELLO heavy oil burner press 60N , heavy oil preheaters, a condensation feed tank, fire protection\oil shut off system , piping and electrical works all carried out within the required deadline. 

February 2024

PROTINO FOODS LTD : ( STEAM BOILER INSTALLATION AND STEAM CONNECTION)

A complete consulting , design , installation and commissioning of a steam plant room carried out for PROTINO FOODS LTD. Our company supplied a PRO-BOILER steam boiler of 4000kg steam capacity with a RIELLO heavy oil burner press 400. Our company completed the project within the required deadline with the finest precision including all the steam line pipe installations and connections, electrical works , pipe insulation and start-up and commissioning of the equipment supplied. 

March 2024

ELYCIUM HOTEL : (TWIN SOFTENER INSTALLATION)

A project for ELYSIUM HOTEL in Paphos. Our company replaced existing water softeners with higher capacity ones of 800 kg each , with Magnum valves with Service flow of 18.2(m³/h). This is to provide soft water for the whole hotel.

January 2024

DROUSIA DAIRY: ( COMPLETE STEAM BOILER INSTALLATION AND STEAM LINE CONNECTION)

This project was for DROUSIA DAIRY factory in Paphos/Drousia. The project consisted of a complete disassembly of existing boiler plant room and re-installing a brand new Levitech Steam boiler of 400kg steam capacity with all its essential equipment such as condensation feed tank , water softener , chemical dosing pamp, blow down vessel , piping and electrical connections, insulation , start-up and commissioning of the whole plant.

December 2023

EL GRECO MEDICAL CENTER: ( REVERSE OSMOSIS PLANT INSTALLATION FOR HEMODYALISIS PURPOSES)

Our company specialises in reverse osmosis units that includes the medical sector too. Pansotech Ltd carried out a project that included a reverse osmosis unit from TEMAK for 1300 liters per hour (LPH) water production for EL GREGO MEDICAL CENTER in Nicosia. The project was for the purpose of Hemodialysis where the water needs to be in the best quality as possible. The project was designed , supplied installed and commissioned by our company. It also consisted of multi media filters, carbon filters, water softener , water storage tank , excess pressure valves, sediment filters for water pre-treatment and all the electrical works and automations. The unit uses potable water maximum electric conductivity of 1000 microsemens and turns it into 0 microsemens. Reverse osmosis (RO) systems typically reject about 95% to 99% of dissolved solids, contaminants, and impurities in water. This includes salts, minerals, bacteria, and other particles.  making it perfect for hemodialysis treatment.

April 2023

ALAMBRA DAIRY PRODUCTS: ( REVERSE OSMOSIS UNIT PRODUCTION OF 125 TONS OF WATER PER DAY )

Project was for ALAMBRA DAIRY PRODUCT , supply , installation and commission of a Reverse osmosis unit for 125 tons of water production per day. The whole system included multi layer filtration and carbon filtration for water pretreatment. Ultra violet system for water disinfection, reverse osmosis membranes and high pressure pump, CIP system for membrane cleaning , flow meters for production and waste flow regulation and a control panel with PLC control and LCD screen display. 

October 2024

LEMONA : ( STEAM BOILER INSTALLATION AND COMPLETE STEAM LINE CONNECTION)

A complete steam plant room for a Meat factory in Lemona Paphos. Our company consulted , designs the steam plant room , supplied all the steam and water equipments , installed and commissioned the equipments in the requested time to provide the best outcome in the most efficient and reliable way possible. Projects consisted of a steam boiler 400kg , RIELLO gas burner , water softener , chemical dosing pump, condensation feed tank, steam pressure reducing station , steam traps, piping and electrical works. 

February 2023

APITHANO LAUNDRY : ( INSTALLATION OF A NEW HEAVY OIL RIELLO BURNER)

Installation of a brand new heavy oil RIELLO burner press 400 for APITHANO LAUDNRY. The project included all the required electrical works and automations , oil supply installation , adjusting and fitting of new burner.

June 2022

ACROPOLIS DC: ( INSTALLATION OF A NEW REVERSE OSMOSIS UNIT FOR 25 TONS OF WATER PER DAY PRODUCTION)

Supply installation and commissioning of a brand new reverse osmosis unit with all the essential equipment, for ACROPOLIS DRY CLEANING in Aradipou. The unit has maximum capacity of 50 tons per day water production and all the essential water pre-treatment for a brackish water of 6000 ms electrical conductivity. This reverse osmosis unit reduces the conductivity of the water from 6000 microsemes to 250 microsemens. 

This helps the customer reduce his costs of water usage and also the soap and detergent usage. Also recused maintenance cost of washing machines and other equipment from scaling due to hard water. 

March 2022

NEFRONTIDA MEDICAL CENTER: ( INSTALLLATION OF A REVERSE OSMSOSIS PLANT FOR A HEMODIALYSIS PURPOSE)

Another project that Pansotech Ltd carried out for hemodialysis purposes. The project was for the NEFRONTIDA MEDICAL CENTER in Nicosia/Strovolos. The project was designed , supplied installed and commissioned by our company. It also consisted of multi media filters, carbon filters, water softener , water storage tank , excess pressure valves, sediment filters for water pre-treatment and all the electrical works and automations. The unit uses potable water maximum electric conductivity of 1000 microsemens and turns it into 0 microsemens. Reverse osmosis (RO) systems typically reject about 95% to 99% of dissolved solids, contaminants, and impurities in water. This includes salts, minerals, bacteria, and other particles.  making it perfect for hemodialysis treatment.